RURAL ELECTRIFICATION PROJECT
*Procurement of 11kv overhead lines materials.
*11kv,33kv high tension and 415kv low tension distribution lines installation
*500KVA 33/0.415kv,500KVA 11/0.415KV,300KVA 33/0.415kv and 300KVA 11/0.415KV distribution substations.
*Procurement, installation and commissioning of distribution 33/0.415kv and 11/0.415KV transformer.



POWER INJECTION SUBSTATION
procurement of 33/11KV transformer injection substation
*Procurement of 33/11KV transformer injection substation
*33/11kv injection substation construction and commissioning
*Procurement of 33kv&11kv high tension panel (630A &1250A),33kv outdoor circuit breaker, 33kv current transformer, 33kv voltage transformer & 33kv&11kv Rings Mains Unit(RMU)